PIPELINE COMPLETION

Post Detail

PIPELINE COMPLETION

PIPELINE COMPLETION

NP-3 class CC pipes of 1400 mm diameter with 0.60 mm thick    calpolic inside GRP lining, were lied between Mayur to Bodal – 7 (Zone –III) and Karkhadi campus of VECL.

Inlet   chambers and inspection chambers were also placed to inspect the water quality of effluent discharge as well as to ease the collection of sample.

Leave a Comment

Your email address will not be published. Required fields are marked *