PIPELINE COMPLETION
NP-3 class CC pipes of 1400 mm diameter with 0.60 mm thick calpolic inside GRP lining, were lied between Mayur to Bodal – 7 (Zone –III) and Karkhadi campus of VECL.
Inlet chambers and inspection chambers were also placed to inspect the water quality of effluent discharge as well as to ease the collection of sample.